Please note: The algorithm descriptions in English have been automatically translated. Errors may have been introduced in this process. For the original descriptions, go to the Dutch version of the Algorithm Register.
Dynamic microsimulation models
- Publication category
- Other algorithms
- Impact assessment
- Field not filled in.
- Status
- In use
General information
Theme
Begin date
Contact information
Link to publication website
Responsible use
Goal and impact
It is intended as a tool for road manager tasks to adequately carry out the work, possibly improve it and substantiate choices. The citizen does not directly notice anything about the programme. Ultimately, the citizen as a traffic participant notices something of the choices made by the municipality as road manager, partly based on the results of simulations, for the traffic flow.
Considerations
The programme is used as an aid in (administrative) decision-making on proposed road and/or intersection redesign and analysis of the operation of intersection traffic controls. It then examines the consequences of the redesign and/or the control programme in terms of traffic flow.
This is the most widely used and proven microsimulation package for traffic management. There is no reason to use anything else.
Human intervention
The results are input for further traffic engineering analysis. It is input in a consideration process how to design the road, set traffic lights and to objectify traffic engineering insights. It is purely a tool for exercising within the task of the road authority. This process can be stopped at any time. There are user groups of road authorities with which the supplier periodically coordinates to make any improvements.
Risk management
There are no specific risks in terms of privacy issues around personal data. Bias does not play a role.
Legal basis
The legal basis lies in proper implementation of the Road Traffic Act. It is an auxiliary tool for the road authority's work.
Operations
Data
Anonymous traffic data (numbers of vehicles, cyclists etc. per hour/time), road layout, traffic control programme settings are used.
Technical design
see website www.ptvgroup.com. The programme provides a visual representation of the expected traffic flows given the intended road layout and traffic light settings and expected traffic flows.
Similar algorithm descriptions
- It is a traffic model to provide city-wide insight into the nuisance caused by activities (construction works, road works and events) on the Bereikbaarheidsregie network (the Hague's main traffic network), in order to safeguard Hague's Accessibility as much as possible.Last change on 23rd of August 2024, at 15:22 (CET) | Publication Standard 1.0
- Publication category
- Other algorithms
- Impact assessment
- Field not filled in.
- Status
- In use
- This algorithm, the forecasting model, provides insight into future peak moments at the municipality's Citizen Affairs desks. This allows additional staff to be hired in time for expected peak moments. This model also supports financial planning.Last change on 27th of June 2024, at 13:10 (CET) | Publication Standard 1.0
- Publication category
- Other algorithms
- Impact assessment
- Field not filled in.
- Status
- In use
- This algorithm falls under Digital Moat. The boating traffic model has been under development since 2022 and will reflect capacity by canal.Last change on 25th of April 2024, at 12:40 (CET) | Publication Standard 1.0
- Publication category
- Other algorithms
- Impact assessment
- Field not filled in.
- Status
- In development
- This algorithm is a calculation programme for determining noise levels from road traffic, railways and industry.Last change on 5th of January 2024, at 14:35 (CET) | Publication Standard 1.0
- Publication category
- Impactful algorithms
- Impact assessment
- Field not filled in.
- Status
- In use
- Retrieve building data such as area/size, type, layout, geometry (shape and location) from various types of drawings for use in (basic) registrations. The status of PDF2GIS is 'under development'. PDF2GIS is in the test phase of phase 1 flat drawing (of 3 phases).Last change on 23rd of August 2024, at 15:38 (CET) | Publication Standard 1.0
- Publication category
- Other algorithms
- Impact assessment
- Field not filled in.
- Status
- In development